Crested Butte South:
Building Process

Learn about the building process in Crested Butte South – including our construction, residential and commercial guidelines along with the Design Review process.

DESIGN REVIEW PROCESS

All new construction projects are reviewed and approved by the Design Review Committee (DRC).  DRC meetings are held the second to last Thursday of each month, although meeting schedules are subject to change based on Directors’ schedules. Prior to final design document completion, it is recommended to meet with the DRC Manager for an omissions and errors review.

Here are the steps to follow and what to include when submitting documents for design review:

For Submittals to CB South Metropolitan District and Gunnison County:

COMMUNITY REMINDERS:

Click on each icon

Make your neighbors proud to live next to you!

Keep your stuff tidy.

Tend to weeds in your yard.

Be kind to the snowplows and park in your designated parking areas and not on the street.

Thank you!

Construction activity that generates noise which is audible beyond your property, such as hammering, sawing, excavation work, and concrete or material deliveries, is permitted:

Monday through Friday – 7 am – 7 pm
Saturday – 8 am – 5 pm
Sunday – 9 am – 3 pm, and the use of heavy equipment is prohibited on Sundays

New address? New phone number? New email?

Please be considerate of others and respect the community’s right to quiet before 7 am and after 7 pm.

Click here for CB South’s noise guidelines.

Trash must be stored in a garage or shed, or a Bear-Resistant container if kept outside. Trash cans with lids may be set on street for collection after 6 am on the day of collection and must be removed from the street by 9 pm on the day of collection.

Dogs off-leash or unattended can cause traffic accidents, injury or harm to others, and confusion when they have no identification tags. Regulations in CB South (unincorporated Gunnison County) require all dogs to be leashed or under immediate voice control. They also need to be licensed, tagged, and current on rabies vaccination.

  • Are billed January 1st
  • Are due the last day of February to avoid additional charges and fees
  • Can be viewed here
  • May be paid by cash or check at the POA Office
  • May be paid online here, and please note payments cannot be automated at this time; these are manual payments and fees apply to use Dues Payment
  • Click here for Payment Plan Agreement

The POA and CB South Metro thank you for using your sprinklers ONLY from 5–10am and 5–10pm

The US Postal Service does not deliver mail to homes in Crested Butte – only to post office boxes.

CB South is considered a Centralized Box Unit Facility and the existing mail building at 61 Teocalli Road has only enough space for about 300 mail boxes and 40 parcel lockers. Currently, all mail boxes at the CB South mail building are rented, and with no more capacity, we are no longer maintaining a waiting list.

The POA Board of Directors is looking at long-term solutions for mail delivery to all CB South residents and will seek input from the community at the appropriate time.

Flood lights need to be angled down at a 45-degree angle so that the light source is not visible from adjacent and/or neighboring properties. Flood lighting is limited and all fixtures need to be down lit and 100% fully shielded. Please take a moment to see if you have light trespassing on your neighbors. No lighting shall be allowed to remain on all night.

CB South complies with Section 13-114 of the Gunnison County Land Use Resolution and the Dark Sky Initiative.

All construction, land use changes, exterior changes to your house and major landscaping/dirt work to your property needs Design Review Committee (DRC) or Association Manager approval prior to starting. Stop by the office at 61 Teocalli Road or call us at 970-349-1162 with any questions or to pick up a builder’s packet